Small Changes, Big Risk: Why Your EA Doesn’t Cover Everything Under an ERA
Lisel Dingley • March 29, 2026

Holding an ERA Doesn’t Mean You Can Do Everything Within It

We regularly see sites assume that because they hold approval for an ERA, they can undertake anything that falls within that ERA.

That’s not how Environmental Authorities work.

An EA does not approve the full scope of what an ERA could include. It approves what you applied for — including the way the activity is undertaken, the infrastructure used, the controls you committed to and the scale and intensity you described.

Sometimes, there are some obvious limitations set by your EA per ERA.  For example, you may hold ERA 54 Mechanical Waste Processing, Threshold 2 (general waste), therefore, if you want to take regulated waste, you know that you aren't licenced to do so, as it is Threshold 3 & 4.  It's the more subtle changes where things can come unstuck, particularly in the waste management ERA space. 

What Your EA Actually Covers
When your EA is granted, it is based on a specific proposal. That proposal includes:
  • The activity itself
  • Where it will occur
  • What materials or wastes are involved
  • How it will be undertaken
  • What controls are in place to manage environmental risk
That combination forms the risk profile that was assessed and approved. It is not a blanket approval for all variations of that activity/ERA.

Where Sites Get Caught Out
Most non-compliances in this space are not deliberate. They come from operational changes that seem minor at the time:
  • Moving an activity to a more convenient location
  • Scaling up volumes
  • Changing inputs slightly
  • Adjusting how something is managed day-to-day
Individually, these can seem insignificant. But from a regulatory perspective, they can fundamentally change the risk to environmental values — which means they fall outside what was originally approved.

Example 1 – Crushing Concrete under ERA 54
You are approved to undertake crushing concrete under ERA 54. What was approved:
  • Crushing within an enclosed building
  • Dust suppression sprays on the machine
  • Settled dust wet cleaned within bunded area, and vac truck removed offsite to be disposed at facility that is licenced to accept it
You now want to undertake crushing outdoors. It’s still crushing — so it feels like it should be fine. But the risk profile is no longer the same:
  • Dust is no longer contained and can travel offsite
  • Fine material can be mobilised into stormwater
  • Noise is no longer attenuated by the building (for offsite sensitive receptors/neighbours)
  • Wind becomes a factor
The original approval was based on a controlled system. Moving outdoors changes how emissions behave and where they end up.

Example 2 – Wastewater Reprocessing under ERA 55
You are approved to receive and reprocess wastewater in ponds. What was approved:
  • A purpose-built pond with engineering design
  • Construction Quality Assurance (CQA) completed
  • Leak detection system installed
  • Groundwater monitoring bores in place
  • Defined and assessed allowable inputs
You now want to construct another pond, or accept a slightly different input. Again, this appears similar.

But, because you think you are already approved for this activity, you aren't putting together an EA application which steps through all the requirements, and therefore, some aspects get missed:
  • If the new pond is missing any of those design or verification elements, seepage risk increases
  • Without monitoring or leak detection, early warning systems are lost
  • Different inputs may behave differently in storage or treatment (for example, odour risk)
  • The original assessment of contaminants and volumes may no longer apply
Even if the pond looks the same, the certainty of performance and level of risk is not the same.

Example 3 – Other Activities under ERA 55
You are the same site as Example 2, already approved under ERA 55 to receive and reprocess wastewater in ponds.

You now want to treat contaminated soils using stabilisation (e.g. lime dosing).  It’s still ERA 55 — so it feels like you should be covered.

But let's think about what was approved:
  • Treatment of liquid waste in lined ponds
  • Risks primarily related to odour, pond failure, seepage and groundwater
What changes:
  • Dust generation from handling soils
  • Airborne contaminants and exposure pathway
  • To be undertaken in an unlined, unbunded area
  • Stormwater contamination from open treatment areas
  • Land contamination risks
  • Potential for offsite reuse (if uncontrolled, contamination of other sites)
Same ERA — completely different risk.

The original EA for wastewater ponds does not consider these impacts, so the new activity has not been approved.

Why “Almost the Same” Isn’t the Same
A key point that is often missed is this: Environmental risk is driven by more than just the activity itself.

It is driven by:
  • How emissions are generated
  • How they are controlled
  • The pathways they can travel
  • The receptors they can reach
Small changes to any of these can significantly change the outcome.

Two activities that look identical operationally can have very different impacts once you consider odour, dust, surface water, noise, or groundwater pathways.

When Do You Need an EA Amendment?
As a general rule: Assume an EA Amendment is required.  Request a pre-lodgement meeting, be clear about the change you are thinking of, and take guidance from the assessing officers. 

This is not a space for “we’ll just make the change and see how it goes”.

Why It Matters
Operating outside the scope of your EA is not just a paperwork issue. It can result in:
  • Non-compliance with conditions
  • Environmental harm or nuisance
  • Regulatory action
  • Be issued a stop works notice, essentially cutting off your source of income
  • Costly and time-consuming remediation or retrospective approvals
We often see sites end up in a far more difficult position trying to justify a change after the fact, rather than assessing it properly upfront.

In Closing
Your EA is not an approval for everything that falls under the ERA listed on your licence.

It is approval for what you applied for — a specific activity, undertaken in a specific way, with specific controls.

If those things change, your approval may no longer apply.

That’s why the detail in your original EA application — and any amendments — matters. What you describe is what gets assessed, and ultimately, is what you are approved to do.

If your operations are evolving, don’t assume you’re covered.

Stop, assess the risk, and confirm whether an amendment is required.

Give us a call to discuss your waste-related activities — whether it’s an original EA application or an amendment.

Call Us
By Lisel Dingley March 27, 2026
When is it a resource? When is it a waste? And what do you actually need to do? 
By Lisel Dingley November 19, 2024
Hypothetical Situation: A site’s Environmental Authority lists a number of groundwater bores, and states that they must be monitored for certain parameters 6 monthly. The EA has another condition which states that a groundwater review must be undertaken every 3 years by an appropriately experienced person (hydrogeologist). The site diligently samples the groundwater bores, and collates the field and laboratory results into a spreadsheet. However, those results are not reviewed when they are received… because the EA says that a groundwater review must be undertaken every 3 years, with no other specific review obligations. Given groundwater monitoring is intended as a warning system for contamination, is only reviewing the groundwater results every 3 years adequate to meet the General Environmental Duty of the Environmental Protection Act? Or a general EA condition such as the requirement to take all reasonable and practicable measure to prevent or minimise the likelihood of environmental harm being caused by the activities? When a dam containing hazardous waste is found to be leaking (found upon visual inspection), and subsequently the previous two years of groundwater data are reviewed and found to indicate this has been occurring prior to the visible leak being detected, it is likely this will not be looked upon favourably in a prosecution. “But it wasn’t time for our 3 yearly review!” is unlikely to be acceptable to the Regulator. Perhaps the EA has another condition which states that deterioration of groundwater quality must be reported to the Regulator within 14 days of receipt of the results. If data is only reviewed every 3 years, how is this condition being met? Perhaps the EA has a condition that requires the development and implementation of a Groundwater Monitoring Plan. It is suggested an adequate Groundwater Monitoring Plan should include guidance on interpretation of results, not just what, when and where to monitor. In our opinion, a Groundwater Monitoring Plan without interpretation guidance is defective and non-compliant with the intent of the condition. And if it does have guidance, is this clear enough to be accurately and swiftly executed by site personnel?  We see many shortcomings in groundwater monitoring. Some of the most common and most significant include: · Data that clearly demonstrates potential environmental harm, which has not been noticed or investigated. There are some really easy ones in this space – your groundwater should not have PFAS in it! If it does, you either have identified contamination of the aquifer or contamination of your samples by your sampling methodology or the laboratory. Regardless, this should be promptly investigated. · Sites not being aware which of their bores is a leak detection bore and which are aquifer monitoring bores. One should be dry and the second should not be dry, and if this is not the case, this needs investigating. · Sites not having modelled groundwater flow direction to determine what is an upgradient (background) monitoring bore, and what is downgradient (identification) monitoring bore, and therefore not being able to interpret results adequately. · Not monitoring water quality in ponds that have the potential to leak, and therefore being unaware of the potential contaminants that would indicate seepage into the aquifer from the pond. Groundwater monitoring can be a highly effective detection system of potential environmental harm, but only if it is undertaken well, by persons with a comprehensive understanding of monitoring well construction, groundwater and contaminants, and with an adequate system of bores in place.
By Lisel Dingley September 17, 2024
Definitely not! We have put together a quick list of aspects which might mean you cannot clear your Category X Vegetation. If Protected Plant Trigger Mapping exists across the area you intend to clear, and you have not had a flora survey undertaken and/or have a protected plant clearing permit. This can also apply if protected plants exist without trigger mapping. If the clearing is through a mapped waterway for waterway barrier works and may constitute a temporary (or permanent) barrier. If the clearing is through a watercourse, and does not meet the exemption requirements of a Riverine Protection Permit, and you do not hold a Riverine Protection Permit. If you are not within your lot boundary, for example, when you lot or your adjoining lots are intersected by a mapped easement such as for a river or road, or you want to clear in the road easement in front of your property. If your clearing will (or may) disturb an animal breeding place and you do not have a Species Management Program in place. If your clearing will include ground disturbance and you have not met your Cultural Heritage Duty of Care requirements. If the vegetation is mapped as protected under a local government planning scheme, and you do not have an approved clearing permit from the local government. We often work with landholders who have unintentionally undertaken unpermitted clearing, and are subject to enforcement action by the Regulator. Remedying this is costly and time consuming. This is not a space for ‘act now, and ask for forgiveness later’. You may find yourself planting back out the trees you cleared plus 50% more, and being committed to ensuring their survival for the next 15 years.